
Add to Cart
PLC Control Pure Water Production Machine 5 Gallon 3 Gallon 20 Liter 19 Liter
(1) This filling line specially produces 3&5 gallons barreled drinking water.
(2)This series barreled filling production line integrates bottle washer, filler and sealer into one unit.
(3) In order to achieve the purpose of washing and sterilizing, bottle washer adopts multiple liquid injections washing and disinfectant spray, and washing solution can be used circularly. The sealer can seal bottle caps automatically.
(4) This filling line equips with water spraying device to sterilize caps of bottles in order to ensure those caps are aseptic and healthy.
(5) This line also can automatically carry out bottle washing, sterilizing, filling, capping, counting and products discharging.
(6) It has features of complete functional, novel design, and high degree of automation. It is a new kind of barreled water auto-producing line, which integrates mechanism, electricity and pneumatics technologies together.
Bottled production line is for 3 gallons, 5 gallons bottled drinking water production.The machine combines washing, filling and capping functions in an organic whole.It is an ideal equipment of mineral water, distilled water, pure water production.Whole stainless steel materials, corrosion resistance, easy to clean.The original main electric adopts SIEMENS, OMRON products, pneumatic system adopts famous brand product, the organization is compact, being a small workshop, high efficiency and stable and reliable, high degree of automation.Operator only needs two people, is a mechanical and electrical gas automatic equipment in the trinity.
bottled line according to its function can be divided into washing, filling and capping three steps, and its working process is as follows:
1. the empty barrel barrel tilted down into the mouth to send buckets, bucket chain movement clearance a location, at this point, the empty barrel barrel mouth barrel body wash for inverted form.
2. a total of four processing procedure: first as the water;The second is disinfectant;The third way for sterile water flushing;The fourth sterile water rinse again;After rinsing with 20 s time for bucket drain well.
3. rinse JingTong chain rotate 45 degrees, down to slip out of the bucket, and the top drum cylinder will flip bucket down 45 degrees put empty barrels in filling, waiting for filling.
4. filling valve driven by cylinder into the barrel mouth, filling automatic exhaust valve by open the filling, the filling time is set by PLC, and can be used according to the liquid level height panel multi-function button modification filling time, in order to achieve the best position, after filling to liquid level, excess water by automatic drain back to the pure water tank, in order to reduce water waste.
5. after filling, by filling a bucket cylinder will have barrels to gland location, for the next step when filling capping, thus the whole process is over.
Our company has rich experience to help customers to establish their different production lines for different use, we can arrange technical staff to help customer set up whole production line:
1. 150-1500ml botle Minera water/Pure water production line;
2. 3-5 gallong water production line
3. PET bottle Carbonated beverage production line;
4. Juice beverage production line;
5. Canning beverage production line;
6. Beer filling line
7. Oil filling line;
8. Tea/Milk/Wine filling;
1.Installation
We promise that our goods are all new and not used. They’re made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
1,After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
2,After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.